Two concrete finishers hand-troweling a fresh sidewalk pour along the form boards
Free on-site estimatesWritten price up frontCall or text 7 days a week
Serving Winston-Salem, Kernersville & the Triad

Concrete Questions, Answered for Winston-Salem, NC

183 straight answers from the crews doing this work across the Triad. If yours is not here, call (336) 608-5157 and ask a human.

(336) 608-5157Get Free Estimate

Pricing and quotes

How much does a concrete driveway cost in Winston-Salem?⌄
Driveways are priced by the square foot, so the size of the pour sets the base number. Four things move it from there: whether an old driveway has to be broken out and hauled off, how much grading and drainage work the site needs, whether you want wire or fiber reinforcement, and the finish. A plain broom finish is the baseline; exposed aggregate and stamped work cost more. We measure on site, walk the grade with you, and put a written price in your hand before any concrete is ordered.
How much does a concrete patio cost?⌄
Square footage sets the base, then the finish and the site decide the rest. Small patios price higher per square foot than big ones because getting a crew and a truck out costs the same either way, so if you are close to the line it is worth having us price a larger footprint at the same time. Stamped, colored and exposed aggregate finishes all add to a broom finish. You get one written price covering the whole job before anything is scheduled.
Do you offer free estimates?⌄
Yes. Call or send the form and we'll have a local contractor out to measure, check the grade and drainage, and put a written price in your hand. No cost, no obligation, no pressure.
What areas do you cover?⌄
Winston-Salem and out across the Triad. In Forsyth County that is Kernersville, Walkertown, Rural Hall, Union Cross and Pfafftown. On the Guilford side, Oak Ridge, Colfax and Summerfield. In Davidson County, Wallburg, Midway and Welcome. If you are near the edge of that, call and ask.
Can concrete be poured in winter in North Carolina?⌄
Yes. Unlike asphalt, we pour concrete year-round in the Piedmont using heated water, accelerating admixtures and insulating blankets. A hard freeze slows us down but the season never shuts down, so if you want work done in January we can usually get it done.
How long does a concrete driveway last?⌄
Thirty years or more when it is done properly, considerably longer than asphalt. That comes down almost entirely to compacting the base correctly and cutting control joints in the right places, which is where we spend the time you never see.
Is concrete or asphalt better for a driveway here?⌄
Concrete costs more up front but lasts substantially longer and needs no sealcoating cycle. Asphalt is cheaper initially and faster to install but wants resealing every three to five years and softens in Piedmont summer heat. For most Forsyth County homes staying put long term, concrete is the better value.
Can you repair concrete instead of replacing it?⌄
Often, yes, and we'll tell you which one you're looking at. Surface cracks, spalling and small sunken sections can usually be repaired or resurfaced. If the base has failed and slabs are moving independently, a repair won't hold, and we'd rather say so than take your money twice.
How long does a concrete driveway or patio take, start to finish?⌄
Most residential driveways are two to four days of work on site: tear-out and haul-off, then grading and base prep, then forming and pouring. A patio is usually one to three. Cure time runs separately from that. You can normally walk on new concrete the next day, and you want vehicles off a driveway for about a week. What moves the day count is how much old concrete has to come out, whether the site needs regrading or drainage work, the size of the pour, and the weather. Rain pushes a pour and there is no way around that. Your written estimate gives you the day count for your job before anything gets scheduled.
What is the best time of year to pour concrete in Winston-Salem?⌄
October and early November if you have the choice. Winston-Salem averages 125 days a year with measurable rain, and July is the worst of it: almost 13 rain days on top of an 88 degree average high. October runs about 9 rain days with nearly no freeze risk, which is the cleanest window we get. Spring works well too. Winter pours are routine here and get done with cold-weather practice, since Forsyth County averages zero days a year that drop below zero. The real constraint is not the season, it is that the fall calendar fills up. Call earlier than you think you need to.
How do I take care of new concrete?⌄
Not much, and that is most of the point. Keep heavy vehicles off it the first week. Wait about 28 days before sealing, then reseal every two to three years to slow water, salt and oil damage. Sweep it and rinse it when it gets dirty. Skip de-icer entirely the first winter. Fine cracks that follow the control joints are the slab doing exactly what those joints were cut for, not a failure.
Can I use salt or de-icer on my new driveway?⌄
Not the first winter. New concrete is still gaining strength, and de-icer drives water in and out of the surface, which is what causes spalling and pitting. After that, use it sparingly. Never use anything containing ammonium sulfate, ammonium nitrate, or magnesium, because those chemically attack the surface rather than just melting ice. Plain sand gives you traction with no chemistry at all. Worth knowing either way: NCDOT pre-treats Triad roads with a 23 percent salt brine up to 48 hours ahead of a storm, so your tires track it onto your driveway whether you put it there or not. Rinsing the slab off after a storm week is a good habit.
Why did my concrete quotes come back so different?⌄
Because most of the price is under the slab where you cannot see it. Two bids on the same square footage can differ by thousands depending on how deep the crew excavates, what base material goes down and how well it gets compacted, whether the slab is reinforced and with what, how thick the pour actually ends up, and whether drainage got designed or ignored. A low bid almost always means one of those got skipped. When you compare quotes, make every one of them answer the same six things in writing: excavation depth, base material, compaction method, slab thickness, reinforcement, and where the water goes. If a bid will not put those on paper, you are not comparing the same job.
Do you take a deposit, and when is the balance due?⌄
You get the deposit amount and the payment schedule in writing with your estimate, so you know the number and the timing before you agree to anything instead of finding out on pour day. Worth knowing for anyone you talk to: a demand for half or more before a shovel hits the ground, cash only, or no written scope of work are the three things that show up over and over when a concrete job goes wrong. Ask for the schedule in writing. Anyone worth hiring hands it to you without being asked twice.
Is the work warrantied?⌄
Get the warranty in writing before you sign, from anyone you hire. A real one names a term, says what it covers, and says plainly what it does not. Workmanship is the part that matters: base prep, joint placement, thickness, finishing. Hairline shrinkage cracking is normal in every slab poured anywhere and nobody warranties against it, so if someone promises you concrete that will never crack, that is the tell. Your written estimate spells out the warranty that applies to your job.
Will the work tear up my yard, sprinklers, or existing driveway?⌄
Some disturbance is unavoidable, because a loaded concrete truck is heavy and it has to get close enough to reach the pour. Before anything starts we walk the access route with you and mark what is in the way: sprinkler heads and lines, invisible fence wire, septic lids, downspout drains, tree roots, and anything buried that you know about and we would not. Sprinkler lines that have to be cut get capped, not left open and forgotten. North Carolina law requires 811 be called at least three full working days before digging, and that obligation sits with the contractor, never with you. Ruts in the grass happen sometimes, and putting them right is part of the job, not a change order.
What happens if it rains on my pour day?⌄
We move you. Nobody pours into rain if they can avoid it, because water hitting the surface during finishing weakens it permanently and you live with that for thirty years. Winston-Salem averages 125 days a year with measurable rain, so this comes up regularly and it is not a sign anything went wrong. Rain after the pour is a different question: once the surface has set, usually a few hours in, light rain does no harm and can help it cure. If the forecast turns on the morning of, we would rather push you a few days than pour a slab we have to come back and fix.
Do I need a permit for a driveway apron or curb cut in Winston-Salem?⌄
Yes, if the work touches the public right-of-way, which is the strip between your property line and the street where the apron sits. The City's Infrastructure Development Standards require a right-of-way permit before construction starts, and building in the right-of-way without one is a misdemeanor, with the driveway subject to removal at the owner's expense. That permit can only be issued to someone licensed and bonded to work in the right-of-way, so it is not one a homeowner can pull themselves. The forms and stone base also have to be inspected before any concrete goes down, with at least two working days notice. Work entirely on your own property is a separate question and a driveway or patio under 40,000 dollars generally needs no building permit at all. If your street is a state highway, both the City and NCDOT have to sign off. We handle the permit and the inspection call as part of the job.
Will a new driveway or patio raise my Winston-Salem stormwater bill?⌄
It can, and almost nobody mentions it before you sign. The city bills residential stormwater in four tiers based on how much hard surface sits on your lot, measured off aerial photography. As of January 2026 those tiers run 61.87 dollars a year up to 2,000 square feet, 65.51 from 2,001 to 4,000, 98.26 from 4,001 to 6,000, and 131.01 above that. Adding a 600 square foot patio can push you across a line and raise the bill for good, and Winston-Salem currently offers no credits to offset it. If you think your lot was measured wrong you can call Stormwater at 336-727-8000 and ask for a re-measurement. The thresholds that trigger actual stormwater engineering start at 5,000 square feet of new hard surface, which no residential driveway is going to reach.
What is under Winston-Salem, and will the soil crack my slab?⌄
Red clay, and the honest answer is that it is not the villain it gets made out to be. The dominant Forsyth County soils, Fairview and Clifford, are kaolinitic, a clay that does not swell much when it takes on water, and the USDA rates their shrink-swell potential as low. What the USDA does flag here is low bearing strength, slope, and frost action. That is a different problem with a different fix: dig deep enough, put down real base stone, and compact it properly. Only about four tenths of one percent of Forsyth County sits on genuinely expansive soil, the Enon and Iredell series over pockets of mafic rock, and if your lot is one of them it changes the prep. That is something worth checking before quoting rather than after. Slabs fail here from poor base prep and poor drainage far more often than from soil movement.

Concrete Driveways

How much does a concrete driveway cost in Winston-Salem?⌄
It is priced per square foot, so measure your drive first. A single-car is usually 12 by 30 feet and a two-car about 24 by 40. From there, heavy grading, poor drainage and breaking out an old surface all push the number up, while an existing compacted gravel base can bring it down. We measure on site and hand you a written price before any concrete is ordered.
How thick should a residential concrete driveway be?⌄
Four inches is standard for cars and light trucks over a properly compacted base. Five to six inches with reinforcement is normal where heavy trucks, RVs, or dumpsters will sit on it.
How long before I can drive on it?⌄
Foot traffic after 24 to 48 hours and vehicles after about seven days. Concrete keeps gaining strength for roughly 28 days, so keep anything heavy off it for the first month.
Will it crack?⌄
Every concrete slab develops some hairline cracking as it cures, which is why control joints are cut. What matters is whether cracks stay tight and cosmetic or open up and move, and that comes down to base compaction and joint placement.

Concrete Patios

How much does a 20x20 concrete patio cost?⌄
A 20 by 20 patio is 400 square feet, and patios are priced per square foot, so that footprint sets the base. Reinforcement, the finish you choose, and how hard the back yard is to get a truck and wheelbarrows into are what move it. Stamped or colored work on the same footprint costs more than a broom finish.
Are small patios cheaper per square foot?⌄
No, usually the opposite. Mobilising a crew and a concrete truck is a fixed cost regardless of size, so very small pours price higher per square foot and some contractors have a minimum job size.
How much does stamped concrete add?⌄
Stamped and colored work typically runs meaningfully more per square foot than a broom finish because of the extra material, forming, and labour in the finishing stage.
How long before I can put furniture on it?⌄
Foot traffic after 24 to 48 hours. Furniture is generally fine after a few days, though heavy planters and hot tubs should wait the full cure.

Sidewalks & Walkways

How much does a concrete walkway cost?⌄
Walks are priced per square foot, so length times width sets the base. A standard front walk is 3 to 4 feet wide. Expect a higher per-square-foot rate than a driveway, because a narrow pour needs far more forming and edging for the same amount of concrete.
How wide should a front walk be?⌄
Three feet is the practical minimum and four feet lets two people walk side by side comfortably. Wider reads better on larger houses with a deep setback.
Can a sunken section be lifted rather than replaced?⌄
Sometimes. Concrete levelling can raise a settled slab if the concrete itself is sound. If it has cracked into several pieces or the base has washed out badly, replacement is the more durable answer.

Concrete Slabs

How much does a concrete slab cost?⌄
Slabs are priced per square foot, so start with your footprint: a shed pad is commonly 10 by 10 or 12 by 16, a workshop 24 by 24 or 30 by 30. Thickness, reinforcement and how easily a truck can reach the pour all move the number from there.
How thick should a shed or garage slab be?⌄
Four inches is typical for a shed or a standard garage floor. Six inches with reinforcement is normal where heavy vehicles, equipment, or a lift will be on it.
Do I need a vapour barrier?⌄
For any slab that will be enclosed and heated, yes. It keeps ground moisture from wicking up through the slab and into flooring, framing, or stored items.

Stamped & Decorative Concrete

How much more does stamped concrete cost?⌄
It runs meaningfully more per square foot than a broom finish because of the added material, color, and labour in the finishing stage. On a patio-sized pour that is usually a noticeable but not prohibitive increase.
Does stamped concrete need sealing?⌄
Yes. Sealer protects the color and the surface, and it needs redoing periodically. Skipping it is how decorative work fades and starts to look tired.
Is stamped concrete slippery?⌄
It can be when wet, particularly with a glossy sealer. A non-slip additive in the sealer handles it, and it is worth asking for on pool decks and entries.

Concrete Repair & Replacement

Is it cheaper to repair or replace concrete?⌄
Repair, when the base is still solid. Crack repair and resurfacing cost a fraction of replacement. If slabs are moving independently or the base has washed out, repairs will not hold and replacement is cheaper over five years.
How do I know if the base has failed?⌄
Slabs that rock or move under weight, sections that have dropped relative to their neighbors, and cracks that keep reopening after repair all point to the problem being underneath rather than on the surface.
Can a new pour be matched to the old concrete?⌄
Not exactly. New concrete cures lighter and takes months to weather in, so a patch or a replaced section stays visible for a while. Replacing to a control joint rather than mid-slab makes the transition look deliberate.
Why are my repair quotes so different from each other?⌄
Because they are quoting different jobs. One contractor is pricing a surface patch, another is pricing base work under the same crack. Make every quote say in writing what it believes is wrong and what it fixes. If a bid cannot name the cause, it is guessing, and cheap guesses get repaired twice.
How long does a concrete repair last?⌄
A repair over a sound base lasts as long as the slab around it. A repair over a failed base fails on the same schedule as whatever is moving underneath, which is why we check the base before recommending anything. Nobody can warranty concrete against a base that is still washing out.
Should I wait and see if the crack gets worse?⌄
Sealing a crack early is cheap insurance, because the crack itself is how water reaches the base, and the base is where repairs turn into replacements. Waiting through one more winter of freeze and thaw with an open crack is usually how a few hundred dollars becomes a few thousand.

Concrete Steps & Stoops

How much do concrete steps cost?⌄
Poured steps are priced per step plus the landing, so the riser count drives it. Most front entries around here are three to six steps. Precast costs less per step but does not tie structurally into the house, and it settles independently of your foundation.
Why are my steps pulling away from the house?⌄
Almost always a footing problem. If the footing was not dug below frost depth or the fill underneath was never compacted, the steps settle independently of the foundation and a gap opens up.
Can steps be resurfaced instead of replaced?⌄
Sometimes, if the structure is sound and only the surface has spalled. If the steps have cracked through or are settling, resurfacing just puts a new face on a failing structure.

Garage & Basement Floors

How thick should a garage floor be?⌄
Four inches is standard for cars and light trucks. Six inches with reinforcement is normal where a lift, heavy equipment, or an RV will sit on it.
Do I need a vapour barrier?⌄
For any slab that will be enclosed and heated, yes. It stops ground moisture wicking up through the concrete into flooring, framing, or stored items.
Can I put epoxy on a new slab straight away?⌄
No. New concrete needs to cure and release moisture first, typically around 28 days minimum, and the surface has to be prepared. Coating too early is the most common cause of epoxy peeling.

Concrete Pool Decks

Is stamped concrete slippery around a pool?⌄
It can be with a glossy sealer, which is why a non-slip additive matters on pool decks specifically. Ask for it by name rather than assuming it is included.
How do you stop the deck getting too hot?⌄
Lighter colors reflect more heat than dark ones, and a textured finish feels cooler underfoot than a smooth one. Color choice makes a real difference on a south-facing deck.
Do pool decks need sealing?⌄
Yes, particularly decorative ones. Pool chemistry and constant wetting are hard on concrete, and sealer needs redoing periodically to keep the surface and color intact.

Concrete Retaining Walls

How tall can a retaining wall be without engineering?⌄
Rules vary by jurisdiction, and walls above a certain height commonly require a permit and sometimes an engineered design. A contractor should tell you where that line falls locally before quoting.
Why is my existing wall bowing?⌄
Almost always water. Without a drainage layer and weep holes, saturated soil behind the wall builds hydrostatic pressure that concrete was never sized to resist.
Poured concrete or block for a retaining wall?⌄
Poured concrete is stronger and better for taller or structural walls. Segmental block is a hardscape product that suits lower decorative terracing and is usually cheaper for short garden walls.

Foundations & Footings

Do foundation and footing projects need a permit in Winston-Salem?⌄
Structural work commonly does, and requirements depend on size, use, and setbacks. A qualified contractor should tell you when a permit and inspection apply and coordinate them rather than leaving it to you.
How deep do footings need to be here?⌄
Below the local frost depth and onto soil with adequate bearing capacity. Piedmont clay behaves differently from sandy fill, which is why depth is determined on site rather than from a table.
Can you pour footings in winter?⌄
Yes, with cold-weather practices, and the subgrade must not be frozen. Concrete is placed year-round here unlike asphalt.

Concrete Sealing & Maintenance

How often should concrete be sealed?⌄
Decorative and stamped surfaces commonly want resealing every two to three years. Plain grey concrete is less demanding and often goes longer, or never gets sealed at all without much consequence.
How soon can new concrete be sealed?⌄
Not immediately. New concrete needs to cure and release moisture first, typically at least 28 days. Sealing too early traps that moisture and can cause the sealer to cloud or peel.
Does sealing stop cracking?⌄
No. Sealing slows water and salt damage to the surface, which extends its life, but it does not prevent shrinkage cracking or movement caused by the base underneath.

Concrete Leveling & Lifting

Is concrete leveling cheaper than replacement?⌄
Usually much cheaper. Lifting a sunken section commonly costs a fraction of removing and repouring it, and it can often be done in a single visit with the surface usable the same day.
How long does a lifted slab stay level?⌄
It depends on why it sank. If the void was a one-off from a washout or poor backfill, the repair is durable. If water is still actively moving soil underneath, the drainage has to be fixed too or it will settle again.
When is leveling not the right answer?⌄
When the slab has broken into multiple pieces that move independently, when it is badly spalled or crumbling, or when the base has failed across a wide area. In those cases replacement lasts longer.
Mudjacking or foam, which is better?⌄
Foam for most residential work. It needs smaller holes, cures in minutes instead of a day, and adds almost no weight to soil that has already proven it settles. Mudjacking still makes sense on some larger or commercial slabs. We tell you which fits your job and why, on site.
How long does concrete lifting take?⌄
Most residential jobs are done in a morning. A single walkway section can be under an hour. With foam you can usually walk and drive on the slab the same day, which is the big practical difference from tearing out and repouring, where you wait about a week for cure.
Will lifting damage my slab?⌄
A sound slab lifts clean. The ports are patched with color-matched material and fade into the surface. The real risk is lifting a slab that was too far gone to begin with, which is why the assessment comes first and why we would rather tell you no than lift something that will not hold.
Why did my slab sink in the first place?⌄
Water or compaction, almost always. A downspout discharging next to the slab, grading that pushes runoff under it, or fill that was never compacted properly when the house was built. The lift fixes the symptom. The estimate visit identifies the cause so you are not paying for the same lift twice.

Commercial Concrete

How is commercial concrete priced differently from residential?⌄
It carries a higher strength mix and a heavier steel schedule for the traffic load, tighter tolerances, and usually phasing to keep the site open. Those all sit on top of the square footage, so a commercial slab prices above a residential one of the same size.
Can you pour around a business that stays open?⌄
Yes, that is normal commercial work. The pour gets phased so part of the parking or access stays usable while another section is demolished, formed and poured, then the crews swap sides.
Do you handle the ADA requirements?⌄
Yes. Where the public parks or walks, slopes and landings have to meet ADA, and getting that right the first time is cheaper than failing an inspection and re-pouring. We build to those slopes as part of the job.

Concrete Parking Lots

Is a concrete parking lot worth it over asphalt?⌄
For a lot that carries trucks or sits in full sun, usually yes over the life of it. Concrete costs more to install but skips the sealcoat cycle, does not soften and rut in summer heat, and lasts roughly twice as long. On a low-traffic lot the math is closer.
How thick does a commercial parking slab need to be?⌄
It is zoned. Passenger-car areas are poured to one thickness and truck lanes, dumpster approaches and loading aprons get thicker and more heavily reinforced because that is where the load concentrates. The engineer's detail or a site assessment sets the numbers.
Can the lot stay partly open during construction?⌄
Yes. Lots are poured in phases so one section stays usable while another is demolished and poured, then the crews move over. It takes longer than closing the whole lot but it keeps the business running.

Concrete Curbing & Gutters

How is curb and gutter priced?⌄
By the linear foot. Straight runs are the cheapest per foot; radius turns, tie-ins and any break-out of old curb add to it. The drainage grade the curb has to hit also matters, because hitting a set fall is more work than pouring a flat run.
Why does parking lot curb break down?⌄
Usually water and traffic. Trucks clip it, freeze-thaw works into any crack, and water getting behind unsupported curb undermines it. Replacing the broken sections and backfilling them properly stops the pavement behind from going next.
Can you match existing curb?⌄
Yes. New sections are formed to the same profile and tied into the sound curb on either side so the run reads as continuous rather than patched.

Dumpster & Equipment Pads

How thick does a dumpster pad need to be?⌄
Heavier than a patio. A loaded dumpster plus the truck that services it is a serious point load, so these pads are commonly poured 6 to 8 inches with a rebar grid, and often with an approach slab where the truck drives on. The exact spec follows the load and any local code.
Why did my old dumpster pad crack?⌄
Almost always thickness or base. A 4-inch slab on a soft base cannot carry a loaded container and a truck, so it cracks and sinks. The fix is a properly sized, reinforced slab on a compacted base, not a patch on the old one.
Can you set anchor bolts for equipment?⌄
Yes, and they have to go in while the concrete is wet. Whatever the generator, transformer or unit needs to bolt down is located and set during the pour, because retrofitting anchors into cured concrete is never as strong.

RV & Boat Pads

How thick should an RV pad be?⌄
Thicker than a car driveway. A loaded RV or a boat on a trailer is a heavy, concentrated load, so these pads are commonly poured 5 to 6 inches with a rebar grid over a well-compacted base. The exact number depends on the weight and how the vehicle is supported.
How long before I can park my RV on a new pad?⌄
Give it the full cure, around 28 days, before the full weight goes on. Concrete takes passenger vehicles at about 7 days but reaches its design strength at 28, and an RV is exactly the load you do not want to test early strength with.
Does the base really matter that much?⌄
On Piedmont clay, yes, more than the slab. A heavy vehicle parked in one spot for months is the load that finds a base that was not compacted. A properly built base is what keeps the pad from settling on one corner.

ADA Ramps & Accessible Concrete

What slope does an ADA ramp have to be?⌄
The standard sets maximums for both the running slope and the cross slope, plus level landings at the top, bottom and any turn. The exact geometry depends on the height being climbed, which is why the rise is the first thing we measure. Building to those numbers is the job.
What happens if a ramp fails inspection?⌄
It usually has to be corrected or re-poured, which costs more than building it right the first time. That is the whole argument for having it done by someone who pours to the ADA slopes rather than eyeballing a ramp and hoping.
Do you handle the railing too?⌄
The railing is often a separate trade, but the anchor points for it have to be set into the concrete while it is wet. We locate and set those as part of the pour so the handrail bolts to something solid.

Exposed Aggregate Concrete

Is exposed aggregate more expensive than a broom finish?⌄
Yes, because revealing and washing the aggregate evenly is extra hand work, and hand work is most of the cost of any decorative finish. It sits between a plain broom finish and full stamped work on price.
Is exposed aggregate good around pools?⌄
It is one of the best choices. The stone texture stays grippy when wet and is comfortable enough barefoot, which is exactly what a pool deck needs. A slip-resistant sealer keeps it that way.
Does it need sealing?⌄
Yes. Sealing keeps the aggregate bright, makes the surface easier to clean, and protects it from freeze-thaw. In this climate plan on resealing every few years, sooner on a pool deck that takes sun and chemicals.

Polished Concrete Floors

Can any concrete slab be polished?⌄
Most can, but the result depends on the slab. A sound, reasonably flat slab polishes well. A cracked, heavily patched or crumbling slab needs repair and prep first, and if it is too far gone, an overlay or a coating may be a better route. We tell you which after looking at it.
Is polished concrete slippery?⌄
A polished floor is no more slippery than most hard floors when dry, and the sealer can include a grip additive for wet areas. The bigger factor is keeping it clean, since any hard floor is slick with water or dust on it.
How is it maintained?⌄
Simply. Dust mop and damp mop, no wax, no stripping, no recoating cycle. That low maintenance is a large part of why shops and showrooms choose it over tile or a coated floor.

Epoxy & Garage Floor Coating

Why do garage floor coatings peel?⌄
Almost always bad prep. A coating rolled over a slab that was only acid-washed instead of mechanically ground, or over a slab with moisture coming up through it, cannot bond and it lets go. Proper grinding and a moisture check are what make a coating last.
Epoxy or polyaspartic?⌄
Epoxy is the proven, lower-cost base. Polyaspartic costs more but cures fast enough to return the garage to use the next day, and it handles UV and temperature swings better. Many floors use an epoxy base with a polyaspartic topcoat to get both.
Is a coating the same as polished concrete?⌄
No. A coating adds a layer on top of the slab; polishing grinds and refines the slab itself with no coating to peel. Coatings give more color and chip options, polishing gives a finish that never delaminates. Which is right depends on the floor and the look.

Stained Concrete

What is the difference between stained and stamped concrete?⌄
Stamping adds texture and pattern to the concrete; staining only adds color and leaves the surface as it is. Staining is often the cheaper way to transform a slab because it needs no forming or pattern work, and it can be done on existing concrete.
Can you stain an existing patio or floor?⌄
Yes, that is one of its best uses. A sound existing slab can be cleaned, stained and sealed to look completely different without a tear-out. The main thing is that any cracks or patches under the stain will still read through, so we set that expectation up front.
Is stained concrete permanent?⌄
Acid stain reacts with the concrete and is permanent; it will not peel or flake. Water-based stains sit on the surface and are also durable when sealed. Both need the sealer maintained over time to keep the color protected, especially outdoors.

Concrete Resurfacing & Overlays

How do I know if my slab can be resurfaced?⌄
It comes down to whether the slab is structurally sound. Surface problems, scaling, staining, shallow wear, hairline cracks, are good overlay candidates. Through-cracks, sections that rock or have settled, and a failing base are not, because the overlay will crack in the same places. We check before quoting.
How long does an overlay last?⌄
Over a sound slab with proper prep and bonding, a well-installed overlay can serve for many years. Over a moving or failing slab it can fail in a couple. The lifespan is set by the concrete underneath, not the overlay itself.
Is resurfacing cheaper than replacing?⌄
Usually, because it skips demolition and removal, which is a real share of a replacement. On a sound slab it is often the better value. On a failed slab it is false economy, and replacement is the honest call.

Concrete Crack & Joint Repair

Should I just fill the cracks myself?⌄
For hairline cracks, a hardware-store masonry sealer keeps water out and is a fine DIY job. Anything wide enough to fit a coin, or with a height difference across it, is worth a look first, because it may be a symptom of movement that a seal will not fix.
Will sealing a crack stop it coming back?⌄
If the crack is stable, yes, sealing keeps water out and holds it. If the slab is moving because the base has failed or water is undermining it, the crack will reopen, and the real fix is leveling, drainage correction or replacement. We tell you which situation you are in.
Why do control joints need refilling?⌄
Control joints are cut to give shrinkage cracking a straight place to happen, and the sealant in them keeps water out of that gap. When that sealant fails, water gets under the slab at the joint, so refilling them is cheap protection against a bigger problem.

Concrete Demolition & Removal

What does concrete removal cost?⌄
It is priced by the amount of concrete, its thickness and reinforcement, and how hard it is to reach and haul. An open driveway is cheap to remove; a reinforced slab in a tight back yard that has to be hand-carried out costs more per square foot. Access is the biggest single variable.
Where does the old concrete go?⌄
It should be recycled. Broken concrete is crushed and reused as aggregate base, so it does not need to go to landfill. That is where ours goes, and it is a fair thing to ask any contractor before they haul yours away.
Can you remove concrete in a tight space?⌄
Yes, it just changes the method and the price. Where a machine cannot reach, the concrete is broken into pieces that can be moved by hand or small equipment. It is slower, so it costs more, but it is routine work.

Concrete Porches

Why is my porch pulling away from the house?⌄
Usually because it was never tied into the foundation, or the base under it has settled. A porch that sits on its own on the grade moves independently of the house and opens a gap at the wall. The fix is rebuilding it doweled into the foundation on a proper base.
Can you repair just the steps?⌄
Sometimes. If the landing and structure are sound and only the steps have failed, the steps can be rebuilt on their own. If the whole porch is settling or pulling away, repairing the steps alone just delays the real fix. We tell you which after looking at it.
Do porch steps need a railing?⌄
Past a certain number of risers, code requires a handrail. The railing is usually a separate trade, but the anchor points for it are set into the concrete while it is wet, so that gets planned into the pour.

Driveway Widening & Extensions

Will the new section match my existing driveway?⌄
In shape and finish, yes, as closely as concrete allows. In color, not at first: new concrete cures a lighter grey than a weathered drive, so the addition is visible for a year or two before the tones blend. Matching the finish and tooling a clean joint is what keeps it looking intentional.
Can you tie new concrete into old concrete?⌄
Yes, and doing it right is the whole job. Dowels are drilled into the edge of the existing slab so the new section is physically tied to it and the two move together. Without that tie-in, a widening cracks along the seam.
Do I have to widen the whole length?⌄
No. Many jobs widen only where the extra space is needed, a parking area near the top, a turnaround by the garage, rather than the full run. It is your layout and your budget, and we price the section that solves the problem.

Concrete Sport Court Pads

How big is a backyard basketball pad?⌄
It depends on what you want. A key-and-hoop practice area is small; a half-court is larger; a full-court is a serious pour. We size the pad to your space and your budget, and lay it out so it plays right at whatever size you choose.
Can I put a coating on the concrete later?⌄
Yes, and that is common. The concrete is the foundation; a color sport coating and painted lines go on top once the slab has fully cured. Pouring it flat and smooth is what lets that coating lie down evenly later.
Can you set the hoop during the pour?⌄
Yes. An in-ground hoop uses a sleeve or anchor set into the wet concrete, square and plumb, so the pole drops in solid. Setting it during the pour is far stronger than trying to anchor a hoop to a finished slab afterward.

Concrete Fire Pits & Outdoor Living

Can you add a fire pit area to my existing patio?⌄
Yes. A fire pit or seating pad can be tied into an existing patio and finished to match or to contrast, so it reads as part of the space. The main things are drainage and a clean joint where the new pour meets the old slab.
What finish is best for an outdoor living area?⌄
It depends on the look and the use. Broom finish is the low-maintenance workhorse; exposed aggregate adds texture and grip; stamped and colored concrete gives the highest-end stone or paver look. Mixing them, plain walks with a stamped feature area, is a common way to get character without paying the top finish rate everywhere.
Is concrete safe around a fire pit?⌄
Concrete handles the heat of a typical fire pit fine as a pad. The main consideration is designing the pit and the surrounding surface sensibly, with the right clearances, which we plan into the layout rather than leaving to chance.

Kernersville, NC

Do I need a driveway permit in Kernersville?⌄
For the apron, where the driveway meets the street, yes. The Town of Kernersville requires a driveway permit for connections to town-maintained streets, and an inspection before any concrete is poured. A single-family connection to an NCDOT-maintained road does not currently need a separate NCDOT permit. Town specs put residential driveways at 10 to 18 feet wide, 24 maximum. We handle the permit and the inspection call as part of the job; the town's Community Development office is at 336-992-0605 if you want to verify any of it yourself.
Can you convert a gravel driveway to concrete in Kernersville?⌄
Yes, and Kernersville is one of the better places to do it. An existing compacted gravel drive is often already doing part of the job of a base, so the conversion costs less than pouring over bare soil, and there is no old slab to break out. We check the compaction on site before quoting, because gravel that has been driven on for years and gravel that was dumped last spring are different starting points.
My Kernersville driveway is only a few years old and already cracking. Replace it?⌄
Usually not. Newer subdivisions out toward Highway 66, Macy Grove Road and Union Cross mostly have sound bases, and early cracking there is more often a surface or jointing issue than a failure underneath. Crack sealing or a sectional repair to the nearest joint costs a fraction of a tear-out. We will tell you which one you actually have.
Do you cover both the Forsyth and Guilford County sides of Kernersville?⌄
Yes. Kernersville sits across the county line and we work both sides of it, including out to Colfax and Oak Ridge on the Guilford side.

Walkertown, NC

How much more does a long Walkertown driveway cost than a short one?⌄
Concrete is priced per square foot, so a 12 by 60 foot drive is about twice the pour of a 12 by 30. On drives that length out along Old Hollow Road and Highway 66 we also look harder at fall and drainage, because a long slab that sheds water badly undermines its own base within a few winters.
Is my existing gravel drive worth anything when converting to concrete in Walkertown?⌄
Often, yes. Gravel that has been compacted by years of traffic can serve as part of the base, which lowers the prep cost against starting from bare soil. We check it on site rather than assuming, and you see the difference in the written price.
Do you pour shed and workshop pads out in Walkertown?⌄
Yes. Larger Walkertown lots mean a steady run of shed pads, workshop slabs and equipment bases. Thickness and reinforcement get sized to what is actually going on top, not a one-size default.

Union Cross, NC

The builder poured a tiny patio at my Union Cross home. Can you extend it or should it be replaced?⌄
Both are done regularly out here. Extending means pouring against the existing slab with a proper joint, and it works when the original pad is sound and thick enough. Where the builder pad is thin or already cracking, replacing the whole footprint at once usually prices better per square foot than it looks. We measure and give you both numbers side by side.
Is early cracking normal in Union Cross's newer neighborhoods?⌄
Hairline cracking within the first years is common and usually cosmetic, especially where control joints were cut late or too shallow. Because most bases out here are recent and sound, sealing or a sectional repair is more often the right call than replacement. The honest check is whether the slabs are moving, and we tell you plainly which situation you have.
Do you serve the whole Union Cross corridor?⌄
Yes. Union Cross, Sedge Garden, out to the Highway 311 side and across to the Kernersville line. Same free on-site estimate and written price everywhere in the corridor.

Rural Hall, NC

What matters most on a long rural drive near Rural Hall?⌄
Drainage, before anything else. A long approach off US 52 that sheds water badly will undermine its own base within a few winters, so the slope gets planned before anyone talks about finish. A concrete drive wants roughly 1 to 2 percent fall across it, and on 200 feet of approach that has to be set with instruments, not eyeballed.
Do you come out as far as Bethania, Stanleyville and Tobaccoville?⌄
Yes. Everything along the US 52 corridor north of Winston-Salem is regular territory, Rural Hall included. The estimate is free either way and the price is in writing before anything is scheduled.
Can a badly sunken section of my Rural Hall driveway be lifted instead of replaced?⌄
Often, yes. Where the concrete itself is still sound, levelling lifts the settled section back into position for well under the cost of replacing it, and you can drive on it within about an hour. Where the slab is broken up, replacement of that section to the nearest joint is the honest answer, and we will tell you which one you have.

Wallburg, NC

Do you work in Davidson County, or just Forsyth?⌄
Both. Wallburg, Midway and Welcome are all regular territory, along with the Forsyth side of the line. Same crew radius, same free on-site estimate, same written price before anything starts.
How thick should a workshop slab be for a Wallburg property?⌄
A standard shed pad is 4 inches. A 30 by 30 workshop slab usually goes 5 to 6 inches with rebar, because the load and the span both climb with what gets parked and stored on it. We size the spec to the use, and the written estimate states the thickness and reinforcement so you can compare quotes on the same terms.
My Wallburg drive has never had a proper base. Does that change the price?⌄
It changes the prep, and the prep is where the price moves. A drive that has been running on bare soil needs a compacted aggregate base built before any concrete is placed. That costs more than pouring over sound existing gravel, but it is the difference between a slab that lasts 30 years and one that cracks out in five.

Clemmons, NC

Is my 1990s Clemmons driveway due for replacement?⌄
Not automatically. A nineties pour on a decent base is often mid-life, not end-of-life. Surface cracking and joint wear can be repaired for a fraction of a tear-out. If sections have sunk or the base has failed, replacement is the honest answer, and we will tell you which one you actually have after walking it.
Can you widen an existing driveway instead of replacing it?⌄
Yes, and in Clemmons widening is one of the most common jobs we see. The new section is tied to the old slab with dowels and separated with a proper joint, matched as closely as the existing finish allows. Concrete does not color-match perfectly across decades and an honest contractor will say so up front.
Do you pour patio extensions in Clemmons?⌄
Constantly. Builder patios from the original construction are usually small and plain. Extending one, or breaking it out and pouring a larger stamped or broom-finished slab, is a one-to-two-day job for most Clemmons backyards.

Lewisville, NC

How do I know if my older Lewisville driveway can be saved?⌄
Walk it and look for movement, not just cracks. Hairline surface cracks with no height change between sections usually mean repair. Sections that rock, sink, or sit proud of each other mean the base underneath has failed, and new concrete over a failed base fails the same way. We check the base before quoting either way.
Do you handle the rural properties off the Yadkin side?⌄
Yes. Longer gravel drives out toward the river are regular conversion candidates, poured in sections so the budget can be staged, apron and parking pad first, the long run later.
What is the most common Lewisville job?⌄
Full driveway replacement on pre-1980 homes, followed by patio upgrades. The town has a high share of long-tenure owners, and they tend to fix it properly once rather than patch it every other year.

Stanleyville, NC

My Stanleyville carport slab is cracked and pitted. Repair or replace?⌄
Depends on depth. Surface pitting and spalling on an otherwise flat slab can be resurfaced. Cracks with height change or a slab that has tilted toward the house mean the base is going, and a repour with correct slope away from the structure is the fix that lasts.
Can you match a new drive to an old concrete apron?⌄
We tie into sound existing concrete with dowels and an isolation joint. New concrete will not perfectly match sixty-year-old concrete in color, and anyone who promises invisible matching is overpromising. It weathers closer over the first couple of years.
Do you work both sides of Highway 52?⌄
Yes, the whole corridor from the Winston-Salem line up through Rural Hall, including Old Rural Hall Road and the streets off University Parkway.

Belews Creek, NC

Is a long gravel drive worth converting to concrete?⌄
Often in stages. Converting the apron at the road and the parking area by the house first covers the sections that take the most wear and rutting, and the connecting run can be poured later. An established, compacted gravel drive is a head start on base prep, and we credit that in the quote.
Do you pour shed and workshop slabs in Belews Creek?⌄
Yes, constantly. Outbuilding slabs on larger rural lots are one of the most common jobs in this part of the county, sized and thickened to what is going to sit on them.
Can concrete trucks reach properties off the smaller roads?⌄
Almost always. A standard truck needs about ten feet of width and reasonable overhead clearance. For genuinely tight sites there are smaller loads and pumping options, and access is exactly the kind of thing the free on-site look settles before anyone commits.

Germanton, NC

Do you pour shop and barn floors near Germanton?⌄
Yes. Workshop and outbuilding slabs are sized to their use: thicker sections and reinforcement where vehicle lifts, equipment, or livestock loads are involved. Say what the building is for and the spec follows.
Is Germanton too far out for a free estimate?⌄
No. The whole northern ring including Germanton and King gets the same free on-site estimate as a house in Winston-Salem.
What base does a rural drive need under concrete?⌄
A compacted aggregate base over stable subgrade. Long-established gravel drives often supply part of this already. Fresh-graded soil does not, and skipping base prep on it is why cheap rural pours crack in two winters.

King, NC

My King driveway is original to the house. Repair or replace?⌄
If it is a pre-1980 pour, honestly assess whether another patch buys anything. Concrete that age with widespread cracking, edge failure, and sunken sections has done its service life. A repour on a properly rebuilt base resets the clock for decades, and staged pours can spread the cost.
Do you serve the rural roads outside King?⌄
Yes, the surrounding Stokes County roads are covered the same as the town itself, including gravel conversions and outbuilding slabs.
Can an old cracked drive be overlaid instead of torn out?⌄
Only when the base underneath is still sound, which on original older drives it often is not. An overlay on a failed base cracks along the same lines. The on-site look tells us which situation yours is, and you get the honest answer before any money moves.

Stokesdale, NC

Can you extend the builder patio on a newer Stokesdale home?⌄
Yes, this is one of the most common calls from the newer subdivisions. The existing slab is tied in with dowels and jointed correctly, or broken out entirely for a single larger pour with a consistent finish, and the on-site look prices both options.
Do new-construction driveways in Stokesdale need anything?⌄
Watch the joints and edges through the first few years. Builder drives are poured to minimums, and early sealing plus joint maintenance is cheap insurance. If cracking shows up beyond hairline, have it looked at before water gets under the slab.
Do you cover the rural roads between Stokesdale and Belews Creek?⌄
Yes, the whole stretch of northern Guilford and northeastern Forsyth between 158 and the lake is inside the service area.

Pfafftown, NC

Can you pour a driveway on a slope in Pfafftown?⌄
Yes. Sloped drives are formed with crowning and edge drainage so water sheds off the sides instead of running the length of the slab into the garage. Steeper runs get a broom finish for traction. Slope changes the forming work, not the feasibility.
My backyard slopes. Can I still get a patio?⌄
Almost always. The slab is cut into the grade and formed level, sometimes with a low retaining edge on the downhill side. Done right it turns an unusable slope into the flattest part of the yard.
Do you cover out toward the Yadkin River?⌄
Yes, the rural northwest including the longer drives off Yadkinville Road and Robinhood Road is all inside the service area.

Oak Ridge, NC

Is it cheaper to pour several projects at once in Oak Ridge?⌄
Usually, yes. Getting crew and trucks to the site is a fixed cost, so a driveway poured the same visit as a walkway and a pad prices better per square foot than three separate mobilisations. If you are planning multiple pours, say so and the quote reflects it.
Do you pour basketball and sport pads?⌄
Yes. A sport pad is a slab with tighter flatness tolerance and a finish that plays well. It is a common Oak Ridge and Summerfield request on the larger lots.
Can you handle a long private drive off 150?⌄
Yes, including staged pours where the apron and house end come first and the middle run follows later.

Colfax, NC

What is different about a driveway that carries work trucks?⌄
Thickness and reinforcement where the load lives. A standard car drive and a drive that parks a loaded dually every night are different specs. Pouring the standard spec under heavy repeated loads is why work-property drives crack early. Tell us the real use and the spec matches it.
Do you pour small commercial slabs in Colfax?⌄
Small shop and outbuilding slabs on residential or mixed-use property, yes. Large commercial site work is a different trade and we say so rather than take it.
Which side of the county line is Colfax work handled from?⌄
Both. Colfax sits in Guilford but the crews serving Kernersville cover it the same, along with Oak Ridge and the 421 corridor.

Summerfield, NC

What decorative concrete options work best in Summerfield?⌄
Stamped patterns and exposed aggregate hold up well in Piedmont freeze-thaw when sealed on schedule. Decorative surfaces want resealing every few years to keep color and protect the texture, so plan for that maintenance before choosing them.
Do you pour pool decks?⌄
Yes, slip-resistant finishes, correct slope away from the pool, and expansion joints where deck meets coping. Pool surrounds are one of the most common large-format jobs on Summerfield lots.
Is a stamped patio worth the extra cost?⌄
When the patio is the feature of the yard, usually yes. When it is a landing pad for the grill, a clean broom finish delivers the same service life for less. We will price both so the difference is a number instead of a guess.

Midway, NC

Do you actually cover Midway and southern Davidson?⌄
Yes. Midway, Wallburg and Welcome are all inside the standard service area, scheduled the same as Winston-Salem proper.
My front walk has sunk and tilted. Small job, will anyone take it?⌄
Yes. Walk repours and sectional replacements are real jobs and part of the everyday mix. Sunken sections near the house are worth fixing sooner rather than later because they usually mean water is moving under the slab toward the foundation.
What is the most common Midway driveway problem?⌄
Age. Original pours with decades of patches, edge crumbling, and sections moving independently. Once sections move on their own, the base has failed and replacement on a rebuilt base is the fix that holds.

Welcome, NC

Do you replace the odd older pours, ramps and cellar approaches?⌄
Yes. Legacy concrete on older Davidson properties gets formed and poured to what the site actually needs. It prices by the specifics, which is what the free on-site look is for.
Is Welcome inside the normal service area?⌄
Yes, the 52 corridor through Midway and Welcome is standard coverage, same scheduling as the rest of the ring.
Can a badly cracked drive be partially replaced?⌄
When the damage is confined to sections and the rest still sits sound on its base, sectional replacement to the nearest joints is a legitimate money-saver. When movement shows across the whole slab, partial fixes chase the problem around. The walk-through settles which one you have.

North Winston-Salem, NC

Do you work the neighborhoods off University Parkway?⌄
Yes, the whole north side including Old Town and out toward Stanleyville and Rural Hall. It is core coverage, not the edge of the map.
My north-side driveway is original to the house. Is patching still worth it?⌄
At some point, no. Fifty-year-old concrete with widespread cracking, crumbling edges and sections moving on their own has done its life. A repour on a rebuilt base resets the clock for decades, and we will tell you honestly if you are not there yet.
Can you replace just the front walk?⌄
Yes. Walk and stoop repours are normal jobs on the north side, and sunken sections that tilt toward the house are worth fixing before water follows them to the foundation.

East Winston-Salem, NC

Do you cover the Waughtown side?⌄
Yes, Waughtown and the streets off 311 are inside core coverage, along with the east side generally out to the county line.
Is the east side served by the same crews as Kernersville?⌄
Yes. The east side, Walkertown, Union Cross and Kernersville are one continuous service area, so scheduling is the same wherever you sit on that corridor.
What is the most common east-side job?⌄
Driveway replacement on the established streets, and patio pours in the newer subdivisions heading toward Kernersville. Two different jobs, one honest rule: the base decides everything, and we check it before quoting.

South Winston-Salem, NC

Can you widen an old ribbon driveway in Ardmore?⌄
Yes, and it is one of the most common south-side requests. The strips either come out entirely for one clean pour, or the middle and edges are filled and tied in. Full replacement usually finishes better and outlasts the patchwork approach, and we price both so you choose with numbers.
Do older south-side homes need permits for driveway work?⌄
Residential flatwork in Winston-Salem generally does not need a building permit, but aprons and anything touching the right-of-way can involve the city. The contractor handles that conversation as part of the job, not you.
How far south do you go?⌄
Through the city limits and on down the 52 corridor: Midway, Wallburg and Welcome are all standard coverage.

Got a question about your own slab? The estimate that answers it is free.

Call or Text (336) 608-5157